Monday, November 16, 2009

Potato Lab

Schedule Through Thanksgiving

Monday 11/16- Prelab potato lab
HW-Write a rough draft of the methods section
Tuesday 11/17-Run Lab
HW-Final Draft of Methods section
Wed 11/18-Finish Potato lab data collection
HW- Write results section
Thursday 11/19-Peer edit methods and results section (Finish Methods and Results)
HW-Write introduction
Friday- 11/20Peer edit Introduction (Finish Intro)
HW- Write Discussion, Conclusion, Abstract, Title Page, References
Monday- 11/23Peer edit Discussion, Conclusion, Abstract, Title Page, References
HW- Study for Cell membrane/osmosis diffusion assessment
Tuesday-11/24 Assessment on Cell membrane/osmosis diffusion assessment
HW-Complete Final draft of Potato lab report
Wed-11/25 Turn in completed lab report

No comments: