Wednesday, November 25, 2009
Potato Lab Report
THE POTATO LAB REPORT FINAL DRAFT IS DUE UPON YOUR RETURN FROM THE THANKSGIVING HOLIDAY.
Thursday, November 19, 2009
Monday, November 16, 2009
Potato Lab
Schedule Through Thanksgiving
Monday 11/16- Prelab potato lab
HW-Write a rough draft of the methods section
Tuesday 11/17-Run Lab
HW-Final Draft of Methods section
Wed 11/18-Finish Potato lab data collection
HW- Write results section
Thursday 11/19-Peer edit methods and results section (Finish Methods and Results)
HW-Write introduction
Friday- 11/20Peer edit Introduction (Finish Intro)
HW- Write Discussion, Conclusion, Abstract, Title Page, References
Monday- 11/23Peer edit Discussion, Conclusion, Abstract, Title Page, References
HW- Study for Cell membrane/osmosis diffusion assessment
Tuesday-11/24 Assessment on Cell membrane/osmosis diffusion assessment
HW-Complete Final draft of Potato lab report
Wed-11/25 Turn in completed lab report
Monday 11/16- Prelab potato lab
HW-Write a rough draft of the methods section
Tuesday 11/17-Run Lab
HW-Final Draft of Methods section
Wed 11/18-Finish Potato lab data collection
HW- Write results section
Thursday 11/19-Peer edit methods and results section (Finish Methods and Results)
HW-Write introduction
Friday- 11/20Peer edit Introduction (Finish Intro)
HW- Write Discussion, Conclusion, Abstract, Title Page, References
Monday- 11/23Peer edit Discussion, Conclusion, Abstract, Title Page, References
HW- Study for Cell membrane/osmosis diffusion assessment
Tuesday-11/24 Assessment on Cell membrane/osmosis diffusion assessment
HW-Complete Final draft of Potato lab report
Wed-11/25 Turn in completed lab report
Thursday, November 12, 2009
Subscribe to:
Comments (Atom)